Union Pacific Railroad
Rollinsville, Colorado
Project consisted of replacing the existing wood trestle railroad bridge over the South Boulder Creek. This project included caisson drilling, river crossing, dewatering and installation of precast pier caps, abutments and deck spans. The superstructure changeover between the existing wood trestle bridge and completion of the new precast bridge was completed on time within an 18 hour window.