Project:

Forest Lakes

Owner

Classic Homes

Location

Monument, Colorado

Description

Project consisted of design, engineering and construction of 2 steel and concrete vehicular bridges. Construction entailed 1785’ pile driving, 182 lf of 42” drilled caissons, 963 cy Cast-in-Place concrete abutments, piers & deck, shoring, scour protection and installation of 151,180 lb structural steel, bridge rail & expansion devices.

Contact Us