Durango & Silverton Narrow Gauge Railroad
Silverton, Colorado
Project consisted of budgetary development, design, engineering and construction of a 10-span steel and precast concrete railroad bridge to span the Animas River. Construction entailed dewatering, pile driving, Cast-in-Place concrete, precast pier cap installation, scour protection and installation of 197,090 lb structural steel.