Colorado Department of Transportation
Wolcott, Colorado
Project entailed construction of a 126’ single span Cast-in-Place concrete deck bridge over the Eagle River. Aspects incorporated into the project included dewatering, drilled caissons, precast concrete box girders, concrete retaining walls, temporary shoring and architectural finishes.