Colorado Dept of Transportation
Grand Lake, Colorado
Project consisted of constructing a temporary bridge to detour traffic and replacing the existing bridge with a 119’ single-span structures utilizing prestressed bulb-tee girders, prestressed deck planking, Ultra High Performance Concrete (UHPC), steel piling and associated roadway paving and improvements.