Colorado Department of Transportation
Westminster, Colorado
Project consisted of replacing the existing bridge structure with a 221’ twin-span bridge utilizing prestressed box girders. This project included extensive water line relocation, highway lighting, traffic signal work, MSE walls, temporary shoring to support 6 fiber optic cables, caisson drilling, pile driving and architectural bridge and pedestrian railing.